Energy & Utilities

BRSR Core numbers an assessor will sign. Meter data at RDSS scale.

Two rails, one chassis: Uthsarg for assessment-grade ESG evidence, and the Smart Meter Data Program for DISCOMs and AMISPs.

The Gap

Meter Data Without Analytics

DISCOMs are deploying millions of smart meters daily under RDSS. Interval data is flowing. But the analytics layer—AT&C loss quantification, theft and anomaly detection, billing efficiency tracking—is being built afterwards. BRSR filing deadlines approach without CORE numbers to report.

Challenge

Interval data at Kafka scale with no real-time analytics infrastructure

Regulatory

BRSR Core 3 & 4 require audited data. Manual aggregations don't cut it.

What We Build

Smart Meter Lakehouse

Streaming ingestion at Kafka scale. MDMS/HES integration. One source of truth for interval data.

AT&C Loss Analytics

Billing accuracy, technical loss quantification, theft anomaly detection with explainable scoring.

BRSR-Ready Dashboards

CORE 3 & 4 compliance. Energy intensity tracking. Audit-trail data lineage for assessor confidence.

Operational Efficiency

Real-time visibility into network losses. Predictive maintenance triggers. Demand forecasting by feeder.

Suryavan Energy · 50 MW AC · Pavagada

Generation-to-Cash · June 2026

Every MWh from SCADA to bank credit · Pravah rails / Datadives · fictional data
24.8%
PLF
₹4.6 L
DSM penalty
₹11.2 L
Curtailment claim
₹28.7 L
Invoice gap
A representative day · schedule vs actual, 96 × 15-min blocks — drag across the curve
■ actual  — schedule  ▨ DSM band breach  ▨ curtailed
00:0006:0012:0018:0023:00
Block 51 · 12:30Scheduled 45.9 MWActual 28.5 MWDeviation -37.9% · outside DSM band
The meter-to-invoice chain
1
SCADA generation (plant)
plant historian
9,214.6 MWh
2
ABT main meter (JMR)
joint meter reading, signed
9,187.2 MWh
3
DISCOM invoice basis
monthly energy bill
9,102.8 MWh
4
Unexplained gap
at PPA tariff ₹3.40/kWh
84.4 MWh ≈ ₹28.7 L
Three numbers that should be one number. Pravah reconciles SCADA → JMR → invoice every month and drafts the dispute the day the bill lands.
DISCOM invoice basis is 84.4 MWh short of the signed JMR. Traced to check-meter substitution in week 2 without a joint protocol. Dispute letter drafted with both meter records annexed.
Recoverable this month across three findings₹44.5 L

Outcomes You'll See

AT&C Loss Visibility

Real-time quantification by feeder, zone, and circle. From spreadsheet lag to live alerts.

BRSR Compliance

CORE 3 & 4 data with audit trails. Reduce filing risk and assessor follow-ups by 80%.

Billing Efficiency

Automated anomaly detection and fraud flags. Revenue recovery acceleration.

O&M Economics

Predictive maintenance dashboards. Extend equipment lifecycle. Lower system downtime.

Accepting new projects

Ready to make your
data AI-ready?

Let's discuss how we can build trusted data foundations for your AI. Book a free data-readiness call with our team today.

Get in touch

Tell us about your project

What are you interested in?

We'll never share your details. Response within one business day.